SIGNAL RETIMING SUBCONSULTANT (FDOT D4)

Signal Retiming Subconsultant (FDOT D4)
Districtwide

The purpose of this contract is the development and implementation of new signal timing plans that enhance mobility on arterial roadways. The goal of this contract is broken into two phases. The first phase will be to create a thorough and repeatable methodology that will identify and prioritize corridors for updated signal timing in conjunction with the local signal maintaining agencies. The second phase will be to utilize the prioritization methodology to identify corridors for signal retiming and develop traditional signal timing plans for those locations. The signal retiming engineering services will include the efforts to develop and/or evaluate signal timing plans that improve traffic flow, reduce delay and stops on the State Highway System while adhering to the procedures and standards found in the Florida Traffic Engineering Manual and the Manual on Uniform Traffic Studies.