SR 826/PALMETTO EXPRESSWAY DESIGN PROJECT FROM I-75 TO EAST OF NW 154 STREET (FDOT D6)

SR-826-MODELING-STUDY

Miami-Dade

Responsible for developing a CORSIM traffic model to evaluate 2 alternatives at the SR 826 at NW 154th Street interchange.  Efforts included traffic data collection, Origin-Destination study, field observations, preparation of multiple CORSIM models to evaluate 2040 build alternatives that included ramp modifications, ramp elimination, and interchange modifications. All efforts were documented in an engineering report.